ASC Start Boat
Inspection 24th June 2009

ASC_Start2_003
ASC_Start2_003

Inside Coachhouse, Dave standing at wheel position showing headroom. Ship floor will be lower than warehouse floor, so more headroom that what it looks

 

ASC_Start2_004
ASC_Start2_004

Inside coachhouse showing shelf at forward end, "Drum" is where stairs will lead downstairs

ASC_Start2_005
ASC_Start2_005

 

 

ASC_Start2_006
ASC_Start2_006

Curved line shows proposed aft edge of coachhouse.

Also Proposed side fixed windows shown.

ASC_Start2_007
ASC_Start2_007

 

 

 

ASC_Start2_008
ASC_Start2_008

angles at front end of coachhouse

Proposed "eye" window on both sides to allow light and air into toilet (starboard side) and bunk area (port)

ASC_Start2_009
ASC_Start2_009

 

 

 

ASC_Start2_010
ASC_Start2_010

Dave holding where middle window opens forward (hinged at top)

 

 

ASC_Start2_011
ASC_Start2_011

 

 

 

ASC_Start2_012
ASC_Start2_012

Approx roof position (height and lip forward) over forward end of coachhouse

 

 

ASC_Start2_013
ASC_Start2_013

approx position of aft end of toilet wall

height of wall is only up to the "join" which is where the "shelf" is on the inside.

Forward end of toilet wall approx where coachhouse meets deck ie. end of white angle bit.

ASC_Start2_014
ASC_Start2_014

Coachhouse roof extends aft to about here (Dave)

 

 

ASC_Start2_015
ASC_Start2_015

coach house roof being made

 

ASC_Start2_016
ASC_Start2_016

Keel about to be joined, sealant being squirted between keel and fibreglass

ASC_Start2_017
ASC_Start2_017

No it is not snowing inside, just looks like it!

ASC_Start2_018
ASC_Start2_018

 

 

ASC_Start2_019
ASC_Start2_019

Bow is NOT this "fine" in real life ... a photo illusion

ASC_Start2_020
ASC_Start2_020

 

 

ASC_Start2_021
ASC_Start2_021

 

 

ASC_Start2_022
ASC_Start2_022

boxes near stern are for fuel and water ... see later photos

ASC_Start2_023
ASC_Start2_023

Top of timber is top of floor level

engine box will be about 100mm higher in this area (see other photo)

 

 

ASC_Start2_024
ASC_Start2_024

Top of timber is top of floor level near rear.

Small slope on floor of about 150mm? front to rear

 

 

ASC_Start2_025
ASC_Start2_025

Floor level goes from stern all the way to here! The position of helmsman.

 

 

 

ASC_Start2_027
ASC_Start2_027

This is the floor size (big). Pic taken from stern looking forward.

Marked rectangle shows engine box area ... about 100mm above floor.

There will be sufficient room to open engine box and stand (or climb in) on keel in front of engine.

ASC_Start2_028
ASC_Start2_028

Timber shows approx aft end of coachhouse, the roof continues to extend to about where circular saw is.

 

 

ASC_Start2_029
ASC_Start2_029

 

 

 

 

ASC_Start2_030
ASC_Start2_030

4 liquid tanks, larger fuel ones each side closer to stern, other 2 are for water.

Internals will be "flowcoated" before putting floor in. Lots of space under floor between and infront of tanks

 

ASC_Start2_031
ASC_Start2_031

Timber shows approx aft end of coachhouse, the roof continues to extend to about where circular saw is.

CYCA_Start
CYCA_Start

CYCA start boat "Gordon Marshall" showing flag layout at side and additional "rocket launches" on roof to hold flags on poles.